热门标签

Usdt第三方支付接口(www.trc20.vip):Fukushima debris removal delayed by another year

时间:4周前   阅读:6

皇冠官网开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠官网开户的平台。皇冠官网开户(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

Usdt第三方支付接口www.trc20.vip)是使用TRC-20协议的Usdt第三方支付平台,Usdt收款平台、Usdt自动充提平台。免费提供入金通道、Usdt钱包支付接口、Usdt自动充值接口、Usdt寄售回收。菜宝Usdt钱包一键生成Usdt钱包、一键调用API接口、一键出售Usdt。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:ug610登陆(www.ugbet.us):No change in power tariff for all consumers in second half of 2022

下一篇:Aaron-Wooi Yik storm into World Championships final

网友评论